020 7131 9703Request a fixed quote
Pencil sketch of a house on drawing paper with a set square, scale rule and pencils laid beside it

Blog: planning

How much do planning drawings cost in London?

Planning drawings for a London house cost £529 drawings + £200 survey (£729 total), and the council charges its own application fee on top, which is £548Ribble Valley Borough Council, guide to the national fee scale from 1 April 2026 for a single house in England from April 2026. Those are the two numbers to budget for; everything else in this guide is about what can move them.

From £729 total, survey included

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, no VAT to add

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Key takeaways

    The two costs: the council's fee and the drawings

    Anyone applying for planning permission to extend or alter a house pays twice, to two different people. The council charges for deciding the application. A drawing professional charges for producing the drawings it decides on. They are easy to confuse because both are called 'planning costs', but only one of them is ours to set.

    For a single house the council's charge is £548Ribble Valley Borough Council, guide to the national fee scale from 1 April 2026 and must be paid when the application is sent in, otherwise the application is invalid. Our share is £529 drawings + £200 survey (£729 total). The two together are the realistic starting budget for a typical London extension, before any extras below.

    What the job costs: our fee from £729Drawings: £529. Measured survey: £200. National planning fee, extension or alteration to a single house: £548 (paid to others)Drawings£529Measured survey£200National planning fee, extension oralteration to a single house£548Total to us, from £729; other costs are paid direct
    Our fixed fee beside the council's application fee. The council's fee is paid to the council, not through us.

    What a planning drawing set actually contains

    Planning officers read plans, not descriptions, so a set has to show the whole change. At the least that means a location plan: based on an up-to-date map, at a scale typically of 1:1250 or 1:2500GOV.UK planning practice guidance, Making an application. A block plan shows the house and its garden against the boundaries. Then come the existing and proposed floor plans, elevations and sections, so the officer can compare what is there with what you want.

    Every one of them has the same two basics, which are easy to miss: plans and drawings must be drawn to an identified scale, and plans must show the direction of northGOV.UK planning practice guidance, Making an application. A drawing that skips the scale or the north point is a common reason for an application to be sent back as invalid, which costs time more than money.

    This is also why we begin with a measured survey rather than copying old plans. Our planning drawings are drawn from your house as it stands, so the 'existing' sheets are right the first time.

    Aerial view of rows of brick terraced houses with rear outriggers and roof windows along a suburban London street
    Terraces like these are why existing plans matter: the officer needs to see how your extension sits against its neighbours. Photo: Altaf Shah, Pexels License

    What can add to the bill in London

    London sites more often carry constraints than most of the country, and each can add a document. If the house is in a conservation area, the council will usually want a heritage statement, which we price separately from £579. A design and access statement is £239 where one is asked for. Before any of that, our planning constraints report is £19 and tells you what applies to your address.

    The council's fee also rises when the work covers more than one home: alterations or extensions to two or more houses or flats cost £1,083Ribble Valley Borough Council, guide to the national fee scale from 1 April 2026, while a single flat pays the single fee. Structural work is also separate: if the extension needs a steel beam, the calculations are priced on their own.

    Not every extension needs planning permission at all. If your plans fit permitted development, a lawful development certificate is the cheaper way to get the council's written confirmation. We check that first, because it is not worth paying for the wrong route.

    How long it takes, and what waiting costs

    A householder application is due a decision within 8 weeksTown and Country Planning (Development Management Procedure) (England) Order 2015, article 34 of the council receiving a valid application. Councils do not always meet that, and nobody can promise a date. The neighbours are also told: a site notice must be displayed for 21 daysDevelopment Management Procedure Order 2015, article 15, which is part of that wait.

    Our drawings are normally ready about a week after the survey. If the council asks for changes to them, we redraw at no charge, so a request from the officer does not become a second drawing bill.

    How the job runs, step by stepFree constraints check of your address and a fixed quote Then: Measured survey of the house as it stands Then: Existing and proposed plans, elevations and sections drawn Then: Location and block plans added, checked by a second person Then: Application prepared and submitted for you Then: Free redraws if the council asks for changesFree constraints check of your addressand a fixed quoteMeasured survey of the house as itstandsExisting and proposed plans,elevations and sections drawnLocation and block plans added,checked by a second personApplication prepared and submitted foryouFree redraws if the council asks forchanges
    The order of work from constraints check to a valid application.

    If the answer is no

    A refusal is not the end. A householder appeal must be made within 12 weeksDevelopment Management Procedure Order 2015, article 37, and we can prepare it: a planning appeal starts from £439. It is worth asking the officer what would change the answer first, because an amended application is often quicker than an appeal.

    The better protection is a good first application. A drawing set that answers the council's likely concerns about scale, neighbours and materials is the most useful safeguard in this whole process, and it is the part of the job we control.

    The figures, with sources

    National planning fee, extension or alteration to a single house
    £548Ribble Valley Borough Council, guide to the national fee scale from 1 April 2026Checked 25 October 2026
    National planning fee, alterations or extensions to two or more houses or flats
    £1,083Ribble Valley Borough Council, guide to the national fee scale from 1 April 2026Checked 25 October 2026
    Decision period for an application that is not major development
    8 weeksTown and Country Planning (Development Management Procedure) (England) Order 2015, article 34Checked 25 October 2026
    Minimum time a site notice must be displayed
    21 daysDevelopment Management Procedure Order 2015, article 15Checked 25 October 2026
    Time limit to appeal a householder decision
    12 weeksDevelopment Management Procedure Order 2015, article 37Checked 25 October 2026
    What a location plan should be
    based on an up-to-date map, at a scale typically of 1:1250 or 1:2500GOV.UK planning practice guidance, Making an applicationChecked 25 October 2026
    What every plan must show
    plans and drawings must be drawn to an identified scale, and plans must show the direction of northGOV.UK planning practice guidance, Making an applicationChecked 25 October 2026

    Questions

    Do I pay the council fee to you?

    No. The council's application fee is paid to the council when the application is submitted, and the receipt comes to you. Our fee is for the survey and drawings only, and has no VAT to add.

    Is the survey really included in the price?

    Yes. £529 drawings + £200 survey (£729 total) shows the drawings, the measured survey and the total side by side, so there is no second invoice for the survey.

    What if my house is in a conservation area?

    The same drawings are needed, and the council will often ask for a heritage statement as well. We tell you at the constraints check, before you commit, so the extra is known up front.

    Does a good drawing set decide the outcome?

    No: the decision is always the council's, and nobody honest can say otherwise. What we do is draw the application carefully and redraw it free if the council asks for changes.

    Do I need planning permission at all?

    Not always. Many rear and loft extensions fit permitted development, and then a lawful development certificate is the right document. We check this before any drawing work is quoted.

    Header photo: A pencil sketch of a house on drawing paper with a set square, scale rule and pencils laid beside it by Czapp Árpád, Pexels License.

    The fixed fee for planning drawings

    Drawings
    from £529
    Measured survey
    £200
    Total you pay
    from £729
    Council fee
    paid to the council separately

    No VAT to add. The fee is fixed in writing after a free constraints check of your address.

    What you get

    • A measured survey of your house
    • Existing and proposed floor plans, elevations and sections
    • Location plan and block plan
    • Application prepared and submitted for you
    • Free redraws until approval
    • More about our planning drawings
    Back of a semi-detached house with a single-storey rear extension being built in grey blockwork, with scaffolding alongside

    Planning

    How much do CIL forms cost in London?

    The Community Infrastructure Levy is a charge on new building, and a missed form can turn an exemption into a bill. Here is what our forms cost, who pays the levy, and the step that catches people out.

    From £493 minute read

    Aerial view of rows of brick terraced houses with rear outriggers and roof windows along a suburban London street

    Planning

    How much do location and block plans cost in London?

    Every planning application needs a location plan and most need a block plan. Here is what they cost on their own, why they are free inside a package, and the red-line mistakes that make an application invalid.

    From £423 minute read

    Slate roof slope with a rooflight set into it, seen from the roof of a house being renovated

    Planning

    How much does a bat survey cost in London?

    Bats and their roosts are protected by law, and a loft conversion or roof job can disturb them. Here is what a preliminary assessment costs, when more surveys follow, and the season that matters.

    From £4953 minute read

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.