020 7131 9703Request a fixed quote
Red-brick house with a slate roof and roof windows, a low glazed extension on its garden side and a striped lawn in front

Blog: conversions

How much do garage conversion plans cost in London?

Plans for a garage conversion in London cost £429 drawings + £200 survey (£629 total). Whether the council charges anything on top depends on one question: do the works change the outside of the garage? If only the inside changes, planning law may not apply at all, but building regulations still do.

From £629 total, survey included

  • MCIAT chartered
  • £2m PI insured
  • LABC Partnered
  • Fixed fees, no VAT to add

Request a fixed quote

We use it to check conservation areas and constraints.
Pick the council that decides your application.
A few lines: what you want to build, and anything the council has already said.
Add photos or drawings

Drop files here or choose from your device

PDF, JPG, PNG, DWG · up to 10 files, 90 MB in total

    Key takeaways

    What a garage conversion costs on paper

    The plans for a garage conversion are £429 drawings + £200 survey (£629 total). That covers the measured survey, the existing garage and house layout, and the new layout showing the changed room, its windows and its link to the house. The council does not necessarily charge anything, which sets this job apart from an extension.

    If planning is needed, the council's fee for an alteration to a single house is £548Ribble Valley Borough Council, guide to the national fee scale from 1 April 2026, due when the application goes in. If you want written proof that no application is needed, a lawful development certificate costs half the normal planning feeRibble Valley Borough Council, guide to the national fee scale from 1 April 2026 at the council.

    What the job costs: our fee from £629Drawings: £429. Measured survey: £200. National planning fee, alteration or extension of a single house: £548 (paid to others)Drawings£429Measured survey£200National planning fee, alteration orextension of a single house£548Total to us, from £629; other costs are paid direct
    Our fixed fee beside the council's planning fee, which is only due if the conversion changes the outside or breaks a condition.

    Does a garage conversion need planning permission?

    It depends on what you do to the outside. The Town and Country Planning Act defines the dividing line: works that affect only the interior of a building, or do not materially affect its external appearanceTown and Country Planning Act 1990, section 55(2)(a). Keeping the garage door and just fitting a floor, walls and insulation behind it can fall on the right side of that line.

    Most owners want the garage door replaced with a wall and a window, and that is an external change. Officers expect new walling to match the house, and the permitted development rules for extensions use the same test: materials of a similar appearance to the existing houseGeneral Permitted Development Order 2015, Schedule 2, Part 1, condition A.3(a). In a conservation area the front elevation gets a closer look. We draw the front elevation carefully for that reason, because it is the part the officer will compare against the street.

    Terrace of yellow-brick Victorian cottages with white sash windows and red door surrounds on a London street
    On a terraced street the front elevation of a converted garage is compared with its neighbours. Photo: trailerfullofpix, CC BY-SA 2.0

    The condition that can stop a conversion

    Many London houses were built on estates where the original permission required the garage or a parking space to be kept. A condition like that survives, and the permitted development order does not override it: nothing in the Order permits development contrary to a condition on an earlier planning permissionGeneral Permitted Development Order 2015, article 3(4). So before we draw, we read the planning history of the address for exactly this.

    If a condition applies, the route is a planning application to vary it, which uses the householder fee and needs a reasoned case. It is much better to learn this at the start than after the builder has been paid.

    The part that is always needed: building regulations

    Even where planning is not needed, the conversion has to meet the Building Regulations: building regulations approval is different from planning permission, and you might need bothGOV.UK, Building regulations approval. A garage is a cold, unheated, often single-skin space, so the walls, floor and ceiling need insulation, the room needs ventilation and a means of escape, and the new link to the house must be fire-separated and signed off.

    Our building regulations drawings, from £729, show those details. Where the garage doorway is bricked up, the new wall and any lintel are shown on the structural side. See our garage conversion plans page for what each set contains.

    How the job runs, step by stepFree constraints check, including the planning history of the garage Then: Measured survey of the garage and the house beside it Then: Existing and proposed plans and front elevation drawn Then: Route chosen: no application, certificate or planning Then: Application or certificate prepared and sent for you Then: Free redraws if the council asks for changesFree constraints check, including theplanning history of the garageMeasured survey of the garage and thehouse beside itExisting and proposed plans and frontelevation drawnRoute chosen: no application,certificate or planningApplication or certificate preparedand sent for youFree redraws if the council asks forchanges
    From constraints check to a certificate or planning application.

    Is a certificate worth having?

    If the conversion changes only the inside, nobody has to approve it, but someone may ask later. A buyer's solicitor will want to know the garage was converted lawfully and without breaching a condition, and a lawful development certificate, from £629 with our drawings, answers that for good.

    The council must decide a certificate application within 8 weeksDevelopment Management Procedure Order 2015, article 39, so it does not hold up the building work much if you apply early.

    The figures, with sources

    Works that are not development
    works that affect only the interior of a building, or do not materially affect its external appearanceTown and Country Planning Act 1990, section 55(2)(a)Checked 25 October 2026
    Permitted development and planning conditions
    nothing in the Order permits development contrary to a condition on an earlier planning permissionGeneral Permitted Development Order 2015, article 3(4)Checked 25 October 2026
    Materials for exterior work
    materials of a similar appearance to the existing houseGeneral Permitted Development Order 2015, Schedule 2, Part 1, condition A.3(a)Checked 25 October 2026
    National planning fee, alteration or extension of a single house
    £548Ribble Valley Borough Council, guide to the national fee scale from 1 April 2026Checked 25 October 2026
    Council fee for a certificate for a proposed use or operation
    half the normal planning feeRibble Valley Borough Council, guide to the national fee scale from 1 April 2026Checked 25 October 2026
    Time for the council to decide a certificate application
    8 weeksDevelopment Management Procedure Order 2015, article 39Checked 25 October 2026
    Building regulations and planning
    building regulations approval is different from planning permission, and you might need bothGOV.UK, Building regulations approvalChecked 25 October 2026

    Questions

    Do I always need planning permission to convert a garage?

    No. If the works affect only the inside, or do not materially change the outside, they may not be development at all. A planning condition on the house can still require the garage to stay, so we check the history first.

    Will converting the garage affect parking?

    It can, and some London councils look at it when a planning application is made. We note your off-street parking on the drawings so the officer sees what remains.

    Do I need building regulations approval?

    Yes, almost always. A garage turned into a habitable room has to meet insulation, ventilation, fire and escape standards, and building control inspects the work.

    Can the garage be used as a separate flat?

    That is a different job. Using part of a house as a separate dwelling is a material change of use that needs planning permission. Ask us about it before you build.

    Header photo: A red-brick house with a slate roof and roof windows, a low glazed extension on its garden side and a striped lawn in front by Scott Hayward, Pexels License.

    The fixed fee for garage conversion plans

    Drawings
    from £429
    Measured survey
    £200
    Total you pay
    from £629
    Council fee
    paid to the council separately

    No VAT to add. The fee is fixed in writing after a free constraints check of your address.

    What you get

    • A measured survey of the garage and house
    • Existing and proposed floor plans and elevations
    • A check of the planning history for conditions
    • Certificate or application prepared and submitted if needed
    • Free redraws until approval
    • More about our garage conversion plans
    Terrace of yellow-brick Victorian cottages with white sash windows and red door surrounds on a London street

    Conversions

    How much do flat conversion drawings cost in London?

    Splitting a house into flats always needs planning permission. Here is what the drawings cost, what the council charges per flat, and the space and sound rules that shape the layout.

    From £1,1693 minute read

    Narrow period house on Heath Street in Hampstead with a bay window and pale green render

    Conversions

    How much do HMO conversion drawings cost in London?

    Turning a house into an HMO can need planning permission, a licence, or both, depending on the number of tenants and the borough. Here is what the drawings cost and which council fees may follow.

    From £8794 minute read

    Flat-fronted Victorian house of 1898 in brick and stone with arched sash windows and a bay

    Conversions

    How much does an HMO licence application cost in London?

    Letting a house to five or more tenants who are not one household needs a licence before the first rent is taken. Here is what the application pack costs, what the council charges separately, and what an unlicensed let risks.

    From £4793 minute read

    City of London skyline glowing at dusk across the Thames under a dramatic orange sky

    Tell us about your property.

    We check the constraints, then send a fixed fee. Messages before 3pm get a reply the same working day.